LayerAudit / Help
Organization setup

Maintain manufacturing locations

Select the organization and confirm the factory’s actual time zone.

Updated: 2026-11-06

Status: draft content. Full workflow verification and key-step screenshots are pending.

Updated: 2026-11-06. Purpose: Maintain manufacturing locations。

Roles

OWNER / ADMIN;授权成员只读 / Authorized members can view

Before you start

Select the organization and confirm the factory’s actual time zone.

Entry: /manufacturing

Steps

  1. Open Manufacturing structure. From All factories, choose New factory and enter its name and time zone.
  2. Open each parent to create workshops, lines and stations. Names are limited to 160 characters; internal codes are generated automatically.
  3. Select a node and use Edit to rename it. Drag its name row to reorder siblings or change to a permitted parent.
  4. Deactivate active children before a parent. Reactivate parents before children.

Expected result

The directory and details retain the saved hierarchy after refresh.

Notes

There is no delete action, shift catalog or separate process level. Each search or child listing returns up to 200 items.

On this page